A customer network engineer has made configuration changes that have resulted in some loss of connectivity. You have been called in to evaluate a switch network and suggest resolutions to the problems.


You have configured PVST+ load balancing between SW1 and the New_Switch in such a way that both the links E2/2 and E2/3 are utilized for traffic flow, which component of the configuration is preventing PVST+ load balancing between SW1 and SW2 links
A. Port priority configuration on SW1
B. Port priority configuration on the New_Switch
C. Path cost configuration on SW1
D. Path cost configuration on the New_Switch
Correct Answer: D
Explanation/Reference:

This causes the port cost for link eth 1/3 to increase the path cost to 250 for all VLANs, making that link less preferred so that only eth 1/2 will be used.



No comments:
Post a Comment